The Church itself
IMAGE 2-1:
Here is the metal structure of the church itself; the tower will house
the bell at the peak. The roof was built as two sections on the ground and
lifted one section at a time.
|
Old & New
IMAGE 2-2:
The old Rutter hall with offices is in the fore ground and the new Rutter hall
with offices underneith isa in the background.
|
Roof Almost Complete
IMAGE 2-3:
The outside wooden fabrication is nearing completion. The congregation is still
celebrating Sunday services in Rutter hall. The old building will not come down
until the very end when the parking lot needs to be created.
|
Bricking the Steeple
IMAGE 2-4:
New stones were used on the front tower structure.
|

|